Auburn Boulevard Complete Streets Project – Phase 2 REBID

The work to be performed consists, in general, of constructing a 1.0 mile long section of Auburn Boulevard within the Cities of Citrus Heights and Roseville, including curb, gutter, sidewalk, storm drain, water main, pavement rehabilitation, irrigation, landscaping, signing, striping, traffic signal, street lighting, gateway monument structure, and undergrounding of overhead utilities.
Addendum 1 (click to expand/collapse)
Name Size
Addendum 1 291.9 KB
Addendum 2 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Addendum 2 - Bid Proposal Checklist 80.3 KB
Addendum 2 - Cover Page 232.1 KB
Addendum 2 - Federal Wage Rates 1.4 MB
Addendum 2 - Prices of Items 130.0 KB
Addendum 3 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Addendum 3 - Cover Page 544.7 KB
Addendum 3 - Section 21-02 81.0 KB